Connect with us

Business

Gas will only be available for eight hours in winter: power minister

Published

on

  • Loadshedding plan being devised to ensure gas supply for eight hours: minister.
  • Says natural gas reserves further depleted by 18% compared to last year.
  • Rs16 billion had been collected from electricity defaulters so far, says Ali.

Caretaker Power Minister Muhammad Ali has said that gas will only be available for eight hours in the winters amid depleting natural gas reserves in the country.

“[Gas] loadshedding has been taking place for the last few years. The loadshedding will occur this year as well because we don’t have enough gas to supply it for 24 hours,” the interim minister said while addressing a press conference in Islamabad on Wednesday.

Like last year, the minister said the loadshedding plan was being devised to ensure a gas supply for eight hours. He said the natural gas reserves have further depleted by 18 % compared to the last year.

Power Minister Ali also expressed hope that the issue of gas shortage for industry in December will be resolved to a greater extent as two liquefied natural gas (LNG) cargoes have been finalised.

The minister said despite various constraints, all-out efforts were being made to ensure the availability of gas to domestic, industrial and fertilizer sectors with minimum gas load management in the coming winter season.

“We have only two LNG terminals and limited natural gas but today we have finalised two LNG cargoes for December, which would help address the gas supply issues in December for the industry. The gas supply was also being improved for the fertilizer sector, he added.

Speaking about ongoing crackdown on power thieves, the minister said an amount of Rs16 billion had been collected from electricity defaulters so far during the ongoing crackdown, which would further continue.

He said it had been decided to change the board of directors (BoDs) of all the power distribution companies (DISCOs).

The management of DISCOs would be handed over to the private sector on long-term concession, he added.

Earlier this week, The News reported that the Petroleum Division was in the process of giving the final touches to a summary to increase the gas tariff, which will be tabled in the Economic Coordination Committee (ECC) meeting for approval

After ratification by the federal cabinet, the government will notify the new gas prices not from July 1, 2023 but from the date the cabinet approves the new tariff, top officials at the energy ministry had told The News.

“The top functionaries of the Petroleum Division have so far planned not to spare even the protected residential consumers just to ensure a zero increase in monthly flow to the circular debt in the gas sector. The protected consumers falling in the first four slabs, utilising gas up to 0.25 HM3, 0.5 HM3, 0.6HM3 and 0.9hm3 may face an increase from Rs300 to less than Rs500 per MMBtu.”

Business

It is anticipated that 150 ships would arrive at Gwadar by the year 2045, allowing the port to handle fifty percent of all imports.

Published

on

By

In an effort to strengthen the port’s economic importance, the Federal Government has made the decision to direct fifty percent of all imports from the public sector to Gwadar Port.

By taking this action, which has the backing of the Special Investment Facilitation Council, the port’s financial situation is going to be improved.

The Cabinet will be presented with a summary of imports through Gwadar by the Ministry of Maritime Affairs, which will take place after Prime Minister Shehbaz Sharif’s recent trip to China.

When the next Cabinet Meeting takes place, Ahsan Iqbal, the Federal Minister for Planning, Development, and Special Initiatives, will examine the Chinese offer for the Karachi to Hyderabad Section of the ML-1 Project and bring it to the Cabinet.

Company preparations for the Shanghai International Import Expo, which will take place in November 2024, are being made by the Board of Investment and the Ministry of Commerce of Pakistan.

One of the most important aspects of the China-Pakistan Economic Corridor is the Gwadar port, which serves as a significant commerce route connecting China, the Middle East, Africa, and Europe. At this time, the Gwadar Port is able to accommodate two huge ships, and by the year 2045, it is anticipated that it would be able to handle up to 150 ships.

By developing the Gwadar Port, regional connectivity would be improved, employment will be created, and international investment will be attracted.

Continue Reading

Business

The price of gold in Pakistan has experienced a significant surge.

Published

on

By

Gold prices in Pakistan surged significantly on Thursday following two consecutive days of decline, with the price per tola rising by Rs2,000 to reach Rs262,100. This increase was in accordance with the downward trend in international market values.

The All-Pakistan Gems and Jewellers Sarafa Association (APGJSA) reported that the price of 10 grams of 24-karat gold rose by Rs1,714, reaching Rs224,708.

Conversely, the world gold market experienced an upward trajectory. According to the APGJSA, the global price of gold surged to $2,503 per ounce following a $22 gain during the trading session.

The local market experienced a significant decline in silver prices, decreasing from Rs50 to Rs2,900 per tola after a prolonged period.

The local market’s gold prices remain subject to the ever-changing dynamics of the international market, as well as domestic considerations such as currency exchange rates and domestic demand.

Continue Reading

Business

The government has not met the deadline set by the International Monetary Fund (IMF) for the approval of a $7 billion loan.

Published

on

By

On Tuesday night, there were virtual talks between representatives of the Finance Ministry and the IMF delegation, with the main topics being external finance and income generation.

According to people familiar with the situation, no date has been set for the IMF’s Executive Board to approve the loan despite the ongoing negotiations.

Officials from the Finance Ministry informed the IMF mission about the government’s initiatives to get outside funding during the discussions. Updates on loan rollovers and fresh finance commitments from allies were included in this. According to sources, the IMF has received a schedule, and loan rollovers are expected to be finished by the end of next week.

The $12 billion in debt must be rolled over before the loan can be approved by the Executive Board, according to the IMF mission.

In the virtual discussions, representatives of the Federal Board of Revenue (FBR) conversed with the IMF team over the revenue deficit. The FBR must reach its revenue goals for this month, according to the IMF mission. As a result, the IMF has asked the FBR to submit a thorough strategy outlining how it will close the gap left by the shortfall and guarantee that revenue goals are reached.

Apart from the conversations on outside funding, there are rumors that the Finance Ministry is actively holding talks with commercial banks in order to obtain new funding. According to reports, negotiations are taking place with four distinct sources for commercial loans, which are anticipated to support the government’s overall financial plan.

Finance Minister Muhammad Aurangzeb disclosed on Tuesday that the IMF was in favor of introducing targeted subsidies. He said that qualifying recipients might receive these subsidies through the Benazir Income Support Programme (BISP).

In order to guarantee consistency, the minister announced that this week’s talks with chief ministers will focus on implementing a similar policy across the country. He was having a casual conversation in parliament with the journalists.

In response to queries about outside funding, Aurangzeb revealed a $2 billion deficit and said that talks to close this gap are progressing. He stressed how crucial it is to obtain business loans.

He went on, “At this point, there’s a need to secure an agreement for commercial loans, not exactly their issuance,” emphasizing that debt rollover negotiations are nearing their conclusion and doing well. The minister expected that these developments would shortly be reported to the governments of allied countries by relevant authorities.

Continue Reading

Trending